Steel Reinforcement Completion
01.12.2026
Construction Update
Steel reinforcement works completion for ZENITH as part of the project’s foundation phase. This stage involved the installation and fixing of reinforcement steel in accordance with approved structural drawings, engineering specifications, and applicable building standards.
The completed reinforcement system provides the necessary tensile strength, load-bearing capacity, and structural stability required for the foundation slab and associated concrete works. With reinforcement now in place, the project is prepared to proceed to the next construction phase, ensuring continuity of structural execution and long-term performance of the building.